The interactive diagram below shows the relationship between the phase angle φ apparent active and reactive power respective energy. The meter count is 100 pulseskwh ie 100 pulses will be required to register one unit.
Carlo Gavazzi Em111 Mid Single Phase Energy Analyzer Series
Import export meter wiring diagram. However some of the metering equipment is common to both metering systems ie. A meter that is installed at the grid connection point and measures the energypower exportedimported tofrom the grid. The power purchased from the grid. Import meter separate export meter operated by the same current transformer 100kw import 30kw export meter test terminal block g export flow direction this scenario is similar to scenario 3. What is the red light above the display on the meter for. The power consumed at the site.
Energy measurement under such situations will depend on applicable tariff structures and hence to cater for different tariff structures in the environment of importexport of activereactive energy special data loggingmeasuring features are required in meters. Designed for normal 230v ac and maximum line current of 30 amps 3. If it is a 2 rate meter then there must be a way of displaying the 2 register values. Like others i have the energy suppliers meter and i also have a total generation meter for the pv panels. Circuit diagram of the energy meter. Can read up to 999999 units kwh with a resolution of 001 units 2.
The iec literature is using the term export. If it does you will be paid for exactly how much you export. Exportimport conditions for both active reactive energy. My main meter is an ampy and it has a button on the face to swap between displaying the import and export values. The power injected to the grid. This is a import condition.
Consumption power is calculated as the sum of self. 100w at 1000 impkwh 100 flashes per hour so 1 every 36 seconds. Theyve given me costs for having a proper export meter fitted so before i cough up for having the export meter fitted and then monthly charges for the meter i want to accurately evaluate the comings and goings of my power. Strange it has no button. Meter wiring diagrams for low voltage meter stations for in whangarei and kaipara. If you have a smart meter it might be able to record your generation export as well as your electricity import from the grid.
Importexport meter information about your solar powered system and how to read your new solar importexport meter. Quadrant iv in quadrant iv reactive power flows negatively and active power flows positively. The red light indicates that you are consuming importing electricity from the grid. The light may appear to be off. This meters are. Includes single phase 2 phase supply 3 phase supply multiple installations distributed generationalternative energy and typical equipment dimensions.
An export meter is a separate meter that records how much energy you export to the grid that you dont use yourself. Its salient features are.